Case Studies
SKF
SKF, Heaton II, Gothenburg, Sweden
Website: www.skf.com
The company:- “SKF was founded in 1907 and grew at a rapid rate to become a global company. As early as 1920, the company was well…
Cullum Detuner
Gas Turbine Test Bed - Water Cooling System
The test bed, located at Rolls Royce, Filton, Bristol was relocated from the now closed plant in Leicester. The gas turbines are due for their…
Alpla - Arla, Aylesbury
In the Autumn of 2012 ICA were tasked with designing and commissioning the empty bottle supply control system for ALPLA as part of the new Arla dairy built at Aylesbury. This formed…
Wyeth Nutrition
Wyeth Nutrition in Ireland produce formula milk for babies and young children.
ICA won the contract from Isoma Conveyors Ltd to provide:-
- Electrical Design and Drawings
- Functional Design Specification
- Electrical Control Panels
- Remote IO, Junction Boxes and…
